41
|
Catatan penilaian risiko menurut ketentuan yang disebut dalam materi harus disimpan minimal:
According to the material, records of risk assessment must be retained for at least:
|
|
42
|
Penerapan kontrol risiko tambahan sebaiknya mendapat persetujuan dari:
The implementation of additional risk controls should be approved by:
|
|
43
|
Dalam persiapan survei kondisi P&I, dokumen bantu yang paling penting adalah:
In preparation for a P&I condition survey, the most important supporting document is:
|
|
44
|
Dalam harmonisasi survei dengan jadwal kapal, yang perlu disiapkan adalah:
When coordinating a survey with the ship’s schedule, what should be prepared?
|
|
45
|
Pada langkah menentukan siapa yang dapat terdampak dan bagaimana, yang dinilai adalah:
In the stage of deciding who may be harmed and how, the assessment focuses on:
|
|
46
|
Istilah well note dalam materi penilaian risiko merujuk pada:
The term well note in the risk assessment material refers to:
|
|
47
|
Jika konsekuensi sangat tinggi dan probabilitas juga tinggi, maka tingkat risiko:
If both consequence and probability are high, the risk level is:
|
|
48
|
Jika konsekuensi tinggi tetapi probabilitas rendah, maka risiko:
If the consequence is high but the probability is low, the risk:
|
|
49
|
Bila probabilitas kejadian diturunkan sementara konsekuensi tetap, maka tingkat risiko:
If the probability of an event is reduced while the consequence remains the same, the risk level:
|
|
50
|
Near miss di atas kapal harus diperlakukan sebagai:
A near miss on board should be treated as:
|