Question
11
Bagaimana cara mengidentifikasi risiko dalam suatu pekerjaan di kapal?
How is risk identified in a shipboard task?
Options
a
Menilai bahaya, kemungkinan terjadinya, dan besarnya akibat
By assessing the hazard, the likelihood of occurrence, and the severity of the consequence
b
Menghitung umur kapal dan mesin utama
By calculating the age of the ship and main engine
c
Mencatat hanya insiden yang menyebabkan kerusakan besar
By recording only incidents that cause major damage
d
Membandingkan jadwal jaga dengan daftar kru
By comparing the watch schedule with the crew list
Grade
Ungraded
Last Update
-
By -
Question
12
Mengapa risiko terhadap kesehatan dan keselamatan harus diprioritaskan?
Why must health and safety risk be prioritized?
Options
a
Karena menyangkut perlindungan jiwa manusia di atas kapal
Because it concerns the protection of human life on board
b
Karena berpengaruh langsung pada cat lambung
Because it directly affects hull paint
c
Karena menentukan kecepatan ekonomis kapal
Because it determines economical speed
d
Karena mengatur urutan bongkar muat di terminal
Because it controls the order of cargo operations at the terminal
Grade
Ungraded
Last Update
-
By -
Question
13
Apa yang dimaksud dengan penilaian risiko?
What is meant by risk assessment?
Options
a
Pemeriksaan sistematis terhadap bahaya, pihak yang dapat terdampak, dan pengendaliannya
A systematic examination of hazards, who may be affected, and what controls are required
b
Pemeriksaan acak terhadap peralatan navigasi
A random inspection of navigational equipment
c
Pencatatan semua pekerjaan dek tanpa analisis
A record of all deck work without analysis
d
Pengujian kekuatan struktur kapal dengan muatan penuh
A strength test of the ship’s structure under full load
Grade
Ungraded
Last Update
-
By -
Question
14
Langkah pertama dalam penilaian risiko adalah:
The first step in a risk assessment is:
Options
a
Mengidentifikasi bahaya
Identifying the hazard
b
Meninjau ulang hasil audit internal
Reviewing the internal audit findings
c
Mencatat temuan ke buku harian kapal
Recording the findings in the ship’s log
d
Menentukan anggaran pengendalian
Determining the control budget
Grade
Ungraded
Last Update
-
By -
Question
15
Setelah risiko dievaluasi, tindakan berikutnya adalah:
After a risk has been evaluated, the next action is to:
Options
a
Menetapkan dan menerapkan tindakan pengendalian yang sesuai
Establish and implement appropriate control measures
b
Menghapus seluruh prosedur lama
Delete all old procedures
c
Mengalihkan semua pekerjaan ke departemen mesin
Transfer all work to the engine department
d
Menghentikan operasi kapal untuk waktu tidak terbatas
Suspend ship operations indefinitely
Grade
Ungraded
Last Update
-
By -
Question
16
Manakah yang bukan keluaran utama dari penilaian risiko yang baik?
Which of the following is not a primary output of a proper risk assessment?
Options
a
Penurunan biaya operasional sebagai tujuan utama
Reduction of operating cost as the main objective
b
Pengurangan risiko terhadap orang dan lingkungan
Reduction of risk to people and the environment
c
Peningkatan kendali terhadap pekerjaan berbahaya
Improved control over hazardous work
d
Dukungan terhadap budaya keselamatan di kapal
Support for a good safety culture on board
Grade
Ungraded
Last Update
-
By -
Question
17
Sebelum memulai penilaian risiko, yang harus dipastikan adalah:
Before starting a risk assessment, it should be ensured that:
Options
a
Prosedur kerja, data pendukung, dan otorisasi yang diperlukan sudah tersedia
The necessary procedures, supporting data, and authorizations are available
b
Kapal harus selalu dalam keadaan kosong muatan
The ship must always be in ballast condition
c
Seluruh kru berada di akomodasi
All crew are in the accommodation
d
Semua pekerjaan non-rutin dihentikan permanen
All non-routine work has been permanently stopped
Grade
Ungraded
Last Update
-
By -
Question
18
Dalam konteks penilaian risiko, ALARP berarti:
In the context of risk assessment, ALARP means:
Options
a
Risiko dikurangi serendah mungkin sejauh layak secara praktis
Risk is reduced as low as reasonably practicable
b
Risiko diterima selama operasi tetap berjalan
Risk is accepted as long as operations continue
c
Risiko dihilangkan dengan menambah awak kapal
Risk is eliminated by adding more crew
d
Risiko dihitung hanya berdasarkan pengalaman masa lalu
Risk is calculated only from past experience
Grade
Ungraded
Last Update
-
By -
Question
19
Tahap yang menentukan apakah suatu risiko dapat diterima atau tidak adalah:
The stage that determines whether a risk is acceptable or not is:
Options
a
Evaluasi risiko
Risk evaluation
b
Identifikasi bahaya
Hazard identification
c
Pencatatan temuan
Recording the findings
d
Pelatihan awak kapal
Crew training
Grade
Ungraded
Last Update
-
By -
Question
20
Berapa jumlah tahap yang umum dipakai dalam proses penilaian risiko sebagaimana dijabarkan dalam materi?
How many stages are commonly used in the risk assessment process as described in the material?
Options
a
Tujuh tahap
Seven stages
b
Empat tahap
Four stages
c
Lima tahap
Five stages
d
Sembilan tahap
Nine stages
Grade
Ungraded
Last Update
-
By -
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Edit Grade

easy medium hard
Edit Question
https://blue-manage.artimu.co.id/

Set Password

Ignore if this is your first time setting a password.

Choose User

Public