https://blue-manage.artimu.co.id/

BLUE Manage

DASHBOARD
Welcome, Guest

MANAGE QUESTION

Function 1 : Marine Engineering at the Operational Level
1.1 Maintain A Safe Engineering Watch
All Assessed Unassessed

MAINTAIN A SAFE ENGINEERING WATCH - Question List

100 Questions   : 99easy 1medium 0hard 0nope
Question
81
Apa yang harus diperiksa pada pipa dan peralatan mesin?
What must be checked on pipes and machinery equipment?
Options
a
Kebocoran-kebocoran
Leaks
b
Jumlah kursi anjungan
Number of bridge chairs
c
Warna bendera kapal
Ship flag color
d
Jumlah sepatu kerja crew
Number of crew safety shoes
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
Question
82
Apa yang harus diperiksa pada expansion tank dan air got?
What must be checked on the expansion tank and bilge?
Options
a
Permukaan air pada expansion tank serta kondisi air got
Water level in the expansion tank and bilge condition
b
Jumlah bahan makanan di store
Amount of food supplies in the store
c
Kondisi meja navigasi
Condition of the navigation table
d
Jumlah dokumen muatan
Number of cargo documents
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
Question
83
Apa yang harus dijaga di engine room selama tugas jaga?
What must be maintained in the engine room during watchkeeping?
Options
a
Kebersihan dan kerapihan peralatan kerja serta engine room
Cleanliness and tidiness of tools and the engine room
b
Kebisingan musik di ruang istirahat
Loud music in the rest room
c
Jumlah barang pribadi crew
Number of crew personal belongings
d
Penataan menu harian
Daily menu arrangement
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
Question
84
Kapan perwira jaga dan oiler pengganti sebaiknya turun ke engine room sebelum serah terima?
When should the relieving watch officer and oiler go down to the engine room before handover?
Options
a
Setengah jam sebelum serah terima jaga
Half an hour before watch handover
b
Lima menit setelah jaga dimulai
Five minutes after the watch starts
c
Saat alarm emergency berbunyi saja
Only when an emergency alarm sounds
d
Setelah kapal selesai berlayar
After the ship finishes sailing
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
Question
85
Apa yang harus dicatat dalam engine log book sebelum serah terima?
What must be recorded in the engine log book before handover?
Options
a
Suhu, tekanan, putaran mesin, dan speed kapal
Temperature, pressure, engine RPM, and ship speed
b
Menu makanan crew
Crew meal menu
c
Jumlah kursi di mess room
Number of chairs in the mess room
d
Nama penumpang kapal
Names of ship passengers
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
Question
86
Apa yang harus diperiksa saat persiapan serah terima jaga mesin?
What must be checked during preparation for engineering watch handover?
Options
a
Jumlah bahan bakar, lubricating oil, cooling fresh water di expansion tank, pompa, OWS, dan steering gear
Amount of fuel oil, lubricating oil, cooling fresh water in the expansion tank, pumps, OWS, and steering gear
b
Jumlah alat makan di galley
Number of eating utensils in the galley
c
Jumlah barang pribadi crew
Number of crew personal belongings
d
Jumlah dokumen promosi perusahaan
Number of company promotional documents
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
Question
87
Apa yang harus dicek pada panel board saat serah terima?
What must be checked on the panel board during handover?
Options
a
Pemakaian tenaga listrik dan lampu indikator
Electrical load consumption and indicator lamps
b
Jumlah kursi di anjungan
Number of chairs on the bridge
c
Kondisi cat lambung kapal
Hull paint condition
d
Jumlah pakaian kerja crew
Number of crew work clothes
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
Question
88
Apa yang harus diperiksa pada mesin yang sedang running?
What must be checked on machinery that is running?
Options
a
Kondisi normal atau abnormal mesin
Whether the machinery condition is normal or abnormal
b
Warna cat mesin saja
Machinery paint color only
c
Jumlah baut emergency di store
Number of emergency bolts in the store
d
Kondisi tempat tidur crew
Condition of crew beds
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
Question
89
Kapan perwira tugas jaga tidak boleh menyerahkan tugas jaganya?
When must the engineering watch officer not hand over his watch?
Options
a
Jika perwira pengganti tidak mampu melaksanakan tugas jaga secara efektif
If the relieving officer is not capable of carrying out the watch effectively
b
Jika perwira pengganti datang tepat waktu
If the relieving officer arrives on time
c
Jika engine log book sudah diparaf
If the engine log book has been signed
d
Jika semua parameter normal
If all parameters are normal
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
Question
90
Apa kewajiban perwira pengganti sebelum menerima tugas jaga?
What is the duty of the relieving officer before taking over the watch?
Options
a
Yakin bahwa regunya mampu melaksanakan tugas jaga mesin
To ensure that his watch team is capable of carrying out the engineering watch
b
Langsung menerima tanpa pengecekan
To take over immediately without checking
c
Meninggalkan engine room sebelum serah terima
To leave the engine room before handover
d
Menghapus catatan jaga sebelumnya
To delete the previous watch records
Grade
Easy
Last Update
03 Aug 2026 10:52
By Gabriel
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10

Edit Grade

easy medium hard
Edit Question
https://blue-manage.artimu.co.id/

Set Password

Ignore if this is your first time setting a password.

Choose User

Public